Monthly Archive: October 2018

Viva GT CAD part 2

So the CAD design work was a success and low and behold thanks to my local bracket making man (Cockwomble Metal Brackets Inc Kenya Division) I now have the bracket in bare metal ready...

Viva GT Fuel injection final fit

This morning I shot down the road to “Jim’s” machine shop and got some help chamfering the cut fuel tube, then push fitted the tube into the fuel rails as instructed in the instructions....

Viva GT Throttle linkage

The correct throttle cable bracket arrived today, so this evening I have assembled the linkage kit onto the throttle bodies, lots of small bits and bobs, so easy to drop one or two. I...

GT a close shave

Today I am sad to report the GT nearly went up in flames this morning! I was sat in bed reading the news when I heard a car horn going, after a few minutes...

Viva GT wiring update

Okay so it has taken a lot of time to get the main wiring loom into the GT, not so complex, just the chap is so busy. But the car is now back at...